Team: Anders Ohlin, Yasemin Yilmaz, Thomas Touma
Project Information |
![]() |
---|---|
Client |
Svenska Kraftnät |
Location |
Snösätra |
Status |
Feasibility study, 2017 |
Collaboration |
Landskapslaget |
This was a feasibility study for the placement of a high voltage switchgear station located in a natural park area. The dramatic topography provided the possibility of differing vantage points around the facility that were integrated into the path system that runs throughout the park. The landscape was carefully planned to “bleed through” the security fencing in order to dissolve the border as much as possible.